SEKURE SX-3100LCD Manual del operador Pagina 255

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 378
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 254
1.0 GETTING READY
Before using the OBD II functions of the Program Card, the following steps must be
performed.
1. Insert the Program Card into the Tester.
2. Insert the OBD II Cartridge into the Tester.
3. Connect the DLC cable to the Tester.
4. Connect the CAN Module (OBD II Connector) to the DLC cable.
5. Connect the CAN Module cable to the vehicle DLC3.
6. The Tester is powered directly from the DLC3 cable. Press o to turn the Tester on.
OBD II SET UP
PROGRAM CARD
CAN INTERFACE
MODULE
DLC CABLE
Vista de pagina 254
1 2 ... 250 251 252 253 254 255 256 257 258 259 260 ... 377 378

Comentarios a estos manuales

Sin comentarios